List B – Building

Checklist B - Building
Hotel: Free trial / self audit
existing
Construction & Doors
yes
no
n.rq.
points
Individual fire compartments
1
Escape routes sufficiently wide
 
1
Escape routes protected against the ingress of fire and/or smoke
 
1
Escape routes as short as possible to an exit door out of the building
1
Persons can stay within an escape route until they reach the outside
1
Blind passages kept as short as possible and protected from the effects of a fire.
1
High fire risk areas separated from an escape route
1
Sufficient number of staircases
1
Staircases enclosed
 
1
Skylight or window for ventilation in the upper part of the staircase
1
Escape routes available at all times
 
1
Hotel bedroom doors always be easily operable from inside
 
1
Access doors to staircases in required quality
1
Doors between staircase and basement in required quality
1
Doors between bedrooms and escape routes in required quality
1
Doors between areas presenting special fire hazards and escape routes in required quality
1
existing
Internal
yes
no
n.rq.
points
Escape routes free from obstacles
1
Escape routes free from misleading mirrors
 
1
Operation of emergency exit doors not obstructed
 
1
Coverings and decorations in required quality
 
1
Emergency routes and exits requiring illumination must be provided with emergency lighting
 
1
Escape routes adequately signposted by standard safety signs
 
1
Assembly Point assigned
 
1
Emergency instructions for staff & guests prominently posted in entrance hall
 
1
A simplified layout plan on each floor
 
1
Emergency instructions for guests prominently posted in each bedroom
 
1
A simplified layout plan in each bedroom
 
1
 Bemerkungen
Total 25 
B1.1 - Preveriti sobe, kakšna so vrata + samozapiralo
B1.2 - preveriti klet mimo wellnesa.
B1.3 - Požarno stopnišče - nastopne plošče so iz lesa/iverica?
B1.4 - preveriti po nadstropjih dolžino poti.
B1.7 - Kuhinja klet - vrata?? preveriti
B1.10 - preveriti na glavnem stopnišču. Evakuacijsko ima ODT.
B1.13 - Izhodna vrata - škatlice s ključi na stenah? ali je to sprejemljivo ali mora biti push sistem?
B1.16 - Kuhinja proti hodniku? preveriti
B2.1 - Vozički / Aktiva !!
B2.4 - Stenske obloge, tla - material?
B2.6 - Dodati oznake v kleti mimo wellnesa in kuhinje